5/19 MAX disruption
MAX Light Rail was shut down through downtown and on the Yellow Line on May 19 after a mistake was made in lifting the Steel Bridge, damaging trains and the overhead wires (55 photos)
Photos per page: Photo size:
Page 3 of 3: Previous Page | Next Page
Boarding the MAX bus shuttle |
View on flickr / original size |
Bus that thinks it's a train |
View on flickr / original size |
Buses that think they're trains |
View on flickr / original size |
Buses emptying at PGE Park |
View on flickr / original size |
0519081638a |
View on flickr / original size |
All three TriMet bus types |
View on flickr / original size |
Un-noble deboarding |
View on flickr / original size |
18th Ave switchman |
View on flickr / original size |
0519081723a |
View on flickr / original size |
0519081735a |
View on flickr / original size |
Switching the tracks |
View on flickr / original size |
0519081737a |
View on flickr / original size |
0519082022a |
View on flickr / original size |
Night work on the Steel Bridge |
View on flickr / original size |
Night work on the Steel Bridge |
View on flickr / original size |
Page 3 of 3: Previous Page | Next Page